Where the past and present come together
| Commercial |
|
The facilities at Hythe Marine Park include a hangar of approximately 10,000m² which houses a platform (cradle) lift and slipway. The slipway hoist can move vessels of around 50 metres LOA , and up to approximately 750 tonnes up the railed slipway and on to the hardstanding. There is also an internal rail system which operates throughout the hangar this allows for traversing and dry docking of multiple vessels, protecting them from the elements. With the addition of a removable steel extension to the slipway cradle, larger vessels of up to c. 70m LOA can be slipped. Working BerthsThe site benefits from a number of alongside berths with varying draughts, this includes sea wall, fixed barge platforms and pontoons. These provide working areas in the water, with service connections. Slipway Winch
SEEDA is working with Yacht Project Associates to bring forward the facility for Superyacht Refit and Repair.
Allan FootTel: 07775910187 This e-mail address is being protected from spambots. You need JavaScript enabled to view it |